Kirsten Wechslberger • MINAMINALS II, Earth to Earth
Minaminals is a conceptual installation project that focuses on ephemeral, experimental, sustainable processeses, materials and themes of art production in the public space. Minaminals II, Earth to Earth‘ encompassed 50 sculptures including tortoises, birds, snakes and snails. Approximately 13 sculptures per animal were installed as one piece in an old fountain in Hellersdorf, Berlin in 2018. The process of decomposition as the artwork was exposed to the weather and other uncontrollable factors was key to the artwork. The planned deliberate decay of the installation is symbolic of the ‘circle of life’, birth and death as found in all ecosystems. Each of the 50 sculptures has a size between 8cm³ and 25cm³. The Minaminals are from the artists own bioplastic and sand receipe of 100% natural, biodegradable materials, from the design of the prototypes, to the cast sculpture.
Το έργο Minanimals είναι μια εννοιολογική εγκατάσταση που εστιάζει σε εφήμερες, πειραματικές, βιώσιμες διαδικασίες σε υλικά και σε κατασκευές σε δημόσιο χώρο. Η εγκατάσταση Minaminals II, Earth to Earthπεριελάμβανε 50 γλυπτά χελωνών, πουλιών, φιδιών και σαλιγκαριών. Περίπου 13 γλυπτά από το κάθε ζώο τοποθετήθηκαν σε ένα παλιό συντριβάνι στο Hellersdord του Βερολίνου το 2018. Η διαδικασία αποσύνθεσης των γλυπτών καθώς αυτά τέθηκαν εκτεθειμένα στον καιρό, καθώς επίσης και άλλοι παράγοντες ήταν το κλειδί γι αυτό το έργο τέχνης. Η σκόπιμα προγραμματισμένη αποσύνθεση της εγκατάστασης συμβολίζει τον «κύκλο ζωής» της γέννησης και του θανάτου, όπως παρατηρείται σε όλα τα οικοσυστήματα. Κάθε ένα από τα 50 γλυπτά έχει μέγεθος μεταξύ 8cm και 25 cm. Τα Minanimals είναι φτιαγμένα από μια σύνθεση βιοπλαστικού και άμμου, και όλα τα υλικά είναι 100% βιοδιασπώμενα, από τον σχεδιασμό μέχρι το εκμαγείο των έργων.
